|
Mud
Flow Network |
Choke manifold
Inspecting high pressure piping and swivels
Diverters |
Manifold operation and inspection
Mud gas separators
API Recommendations |
|
Ram
BOPs |
Closing and opening ratios
How to do a ram cavity inspection, cavity problems
Hydraulic system operation
Pressure testing |
Packer pressure and ram block operation
Manual locks, safe operating procedures
Introduction to hydraulic locking devices
Shearing capacities, booster cylinders |
|
Production
and Workover Ram BOPs |
Manually operated rams
Single and dual offset ram blocks |
Snubbing rams, ram block snubbing
inserts
Stripping considerations |
|
Annular
BOPs |
Operation for enhanced packer life
Stripping considerations |
Drift testing, problems encountered in
testing
Hydraulic system operation and testing |
|
Gate
Valves |
Metal to metal sealing in the gate valve
Hydraulic valve operators |
Inspecting valves and potential problems |
|
Introduction
To BOP Control Systems |
Major components of control system
API accumulator recommendations |
Accumulator sizing and how to check it
Valve symbols and circuits |
|
"What
Is An Acceptable Pressure Test?" |
|
Material
Requirements For H2S Service - NACE MR0175 |
Effects of H2S on equipment
Use of shear rams in H2S environments |
Equipment requirements for H2S service
Suitability of repaired equipment with H2S |
|
API
Flanges |
Comparison of connection types and gasket
selection |
Torque requirements, effect of lubricant |